We deliver compressed and liquefied natural gas to industrial sites through our own fleet and network of stations. We connect factories to gas without the need for a direct pipeline connection.
Our planned LNG plant has a capacity of 190 tonnes per day. At 90% uptime over a 365-day year, projected output is 62,415 tonnes annually. Feed gas composition and allocation are shown below.
- Planned plant capacity
- 190TPD
- Projected LNG/year at 90% uptime
- 62,415T
- Methane in our feed gas
- 94.7%
- Feed gas allocation
- 10MMSCFD
Technical specification
GCE-SMA-26
Feed gas
- 10 MMSCFD, contracted for 10 years
- Arrives at 50–70 bar
- No hydrogen sulphide detected
The plant
- Dehydration and clean-up first
- Modular liquefaction package
- Storage with boil-off gas management
Output
- About 190 tonnes of LNG a day
- Around 62,000 tonnes a year
- Space kept for a second train
Build with us
Bring dependable gas to the heart of your operation.
Tell us where you operate, what you produce and the energy demand you need to meet. We will map the route from supply to your gate.