Solutions · Virtual pipeline
Gas to your gate. No pipe required.
We liquefy natural gas in Imo State and truck it straight to factories the pipeline network never reached. Four ways to plug in.
- Tonnes / day
- 190
- Per tanker
- 20 t
- Trips / day
- 9–10




01 / 04
Small-Scale LNG
We chill pipeline gas into a liquid at our own plant, so it can travel to places pipes never reach.
Explore Small-Scale LNG →The problem
The demand is there. The pipe isn’t.
Today · 01
Diesel
What most plants fall back on, and what most generators burn.
Today · 02
LPG
Used where gas is needed but no pipeline reaches.
Today · 03
Everything else
A patchwork of fuels, each with its own supply headache.
The fix
Swap the pipe for a chain.
- 01
Gas source
10 MMSCFD on a 10-year renewable contract
- 02
LNG plant
Cleaned, liquefied and stored
- 03
LNG tanker
Cryogenic road transport
- 04
Your factory
Gas at the gate, no pipeline needed
Phase 1 · Imo State
Our first plant, in numbers.
These are planning figures. We'll firm them up once front-end engineering confirms exactly what the plant can produce.
- 62,415T / YR
- LNG we plan to make every year
- 190TPD
- Tonnes a day
- 10MMSCFD
- Gas coming in

What's in our gas · Tested sample
- Methane
- ~94.7%
- Carbon dioxide
- Low
- Nitrogen
- Low
- Hydrogen sulphide
- Not detected
- Feed pressure
- 50–70 bar
Clean gas in means clean gas out. No sulphur to worry about in your burners.
Phase 1 · What we're building
~190 TPD
Liquefaction, storage and truck loading, all sized around our 10 MMSCFD gas supply.
Phase 2 · Room saved
+ train
Another LNG train when more gas comes online, plus CNG, LPG, gas-to-power and pipeline supply. Planning for it now is much cheaper than redesigning later.
Side by side
Which one's for you?
| Small-Scale LNG | Virtual Pipeline | Industrial Gas Supply | Energy Infrastructure | |
|---|---|---|---|---|
| Headline | 190TPD Planned plant capacity | 20T Tonnes in every tanker | 30–40TPD Anchor customer volume | +1Train Extra LNG train reserved |
| Scale | 62,415T Projected LNG/year at 90% uptime | 9–10Trips Loaded trips out each day | 10–20TPD Medium customer volume | 4Streams New product streams planned |
| Detail | 94.7% Methane in our feed gas | 0KM Pipeline needed at your site | 10Yrs Gas supply secured for | 18–24Mo Development timeline |
| Good to know | 10MMSCFD Feed gas allocation | −162°C LNG travels at | 1Price Priced on a delivered basis | 190TPD Phase 1 base |
| Best for | Steel, Glass & ceramics, Large manufacturing | Food & beverage, Industrial estates, Anywhere off the grid | Any site burning diesel or LPG today | Industrial estates, Captive power users, Greenfield plants |
Insights


